
Designed specifically to function as the pre-treatment device when applied in a stormwater treatment train, BaySeparator PT allows for greater pollutant removal and increased efficiency down the line. It’s engineered to typically remove 50% of the suspended solids on an annual aggregate removal basis, or other required methodology, from stormwater prior to the next BMP in the “train’s” succession, such as BayFilter.